OSHA Region 1 & 2 · NY · NJ · MA · CT · RI · NH · VT · ME · PAsafety@safetynortheast.com

Compliance · Recordkeeping

OSHA Form 300A, 300 & 301 Electronic Reporting (29 CFR 1904.41)

Every year by March 2, covered establishments submit injury and illness data to OSHA through the ITA. Establishment size and industry decide which forms you send.

Published 2026-11-21 · Sources cited under each table

Who must submit

Under 29 CFR 1904.41, the duty to file electronically depends on the size of each establishment (a single physical location), not the whole company, and on its industry.

Establishment sizeIndustryMust submit by March 2
20–249 employeesAppendix A high-hazard industries (includes Construction, NAICS 23, and Manufacturing, NAICS 31–33)Form 300A
250+ employeesAny industry required to keep OSHA records (not partially exempt)Form 300A
100+ employeesDesignated Appendix B high-hazard industriesForm 300A, Form 300 (log) and Form 301 (incident reports)
Under 20 employeesAnyNo annual electronic submission (unless OSHA asks in writing)

29 CFR 1904.41 and Appendices A and B to Subpart E.

Recordkeeping itself is separate: employers with more than 10 employees company-wide in non-exempt industries keep the OSHA 300 log, 301 reports and 300A summary, and post the certified 300A from February 1 to April 30. Severe injury reporting applies to everyone: fatalities within 8 hours; in-patient hospitalizations, amputations and loss of an eye within 24 hours.

Filing through the ITA

  • Portal. OSHA's Injury Tracking Application (ITA), signed in with a Login.gov account.
  • Deadline. March 2 each year, for the previous calendar year's data.
  • Methods. Manual web entry per establishment, CSV upload for multiple establishments, or API submission from recordkeeping software.
  • Case-level data. Appendix B filers submit individual case information from the 300 and 301; OSHA does not collect employee names or addresses through the ITA.

TRIR & DART formulas

The same numbers you file with OSHA drive the incidence rates GCs and ISNetworld or Avetta use to grade you.

TRIR = (Total recordable cases [cols G + H + I + J] × 200,000) ÷ Total hours worked
DART = (DART cases [cols H + I] × 200,000) ÷ Total hours worked

200,000 hours is 100 full-time employees working 40 hours a week for 50 weeks. Use hours actually worked: exclude vacation, sick leave, holidays and other paid time off.

Example: 2 recordable cases, 1 DART case, 85,000 hours. TRIR = 2 × 200,000 ÷ 85,000 = 4.71. DART = 1 × 200,000 ÷ 85,000 = 2.35. For a roofing contractor (BLS TRIR 2.4, DART 1.7) both are above the industry average.

BLS SOII benchmark table

NAICSIndustryTRIRDART
—All private industry2.31.3–1.4
31–33Manufacturing2.71.7
23Construction total2.21.3
236Construction of buildings2.21.3
2361Residential building2.51.4
2362Nonresidential building1.91.2
237Heavy & civil engineering1.81.0
2371Utility system construction1.40.8
2373Highway, street & bridge2.51.5
238Specialty trade contractors (overall)2.31.4
23811Poured concrete foundation & structure2.82.0
23812Structural steel & precast concrete2.81.3
23813Framing contractors4.63.4
23816Roofing contractors2.41.7
23821Electrical contractors1.81.1
23822Plumbing, heating & air-conditioning3.01.7
23831Drywall & insulation2.92.0
23891Site preparation contractors1.51.0

U.S. Bureau of Labor Statistics, Survey of Occupational Injuries and Illnesses (SOII), incidence rates per 100 full-time workers.

Common filing mistakes

  • Filing at the company level when the rule counts each establishment separately (and missing a 20+ yard or shop).
  • Using total paid hours instead of hours worked, which understates TRIR and DART and will not match a carrier audit.
  • Leaving the 300A uncertified by a company executive before posting.
  • Recording first-aid-only cases, or missing restricted-duty days that make a case DART.
  • Waiting until the last week of February and losing a day to Login.gov account setup.
Check your rates and your filing duty

The calculator compares your TRIR and DART with this table and runs the 1904.41 check.

Open the calculator

Retained clients get monthly log review and the March 2 filing handled: audits & retainers.

Mobilization, training & audits

Have a start date, a bid deadline or an inspection coming?

Send the project details. We reply with scope questions or a written proposal for staffing, crew training, written programs or a mock audit.